FilingSEC EDGAR8-K
Soluna Holdings Completes Project Kati 1 and Secures Conditional Base Load Classification
· SEC accepted
StageOperational
Filing content
Soluna Holdings energized the final 14 MW at Project Kati 1, completing the 83 MW site, and secured a conditional Base Load classification from ERCOT for the full 166 MW campus.
AI summary of the filing. Please also check the source.Analyzed by WAPE AI.
Preparing English content…
Comments —
Loading comments…